DaTE
|
allotment id
|
Name of
Division
|
title of the
allotment
|
MAJOR HEAD |
03.12.2024 |
225 |
Chief engineer office |
PROTECTION WORK USING STONE PITCHING WITH LAUNCHING APPRON
ON RIVER JHELUM UNDER FMP
|
4711-fmp |
02.12.2024 |
224 |
Chief engineer office |
Allotment no.
24 of 2024-25 a) Construction of Toe wall with stone Pitching on LP Bund
of River Jhelum at Dangerpora RD 94.000-94.250
KM(L=250Mtrs), LP Bund of River Jhelum U/S Shadipora Bridge
RD 95.848-97.000 KM, LP Bund of River Jhelum Wangipora
Opposite Grid Station RD 101.700-101.820 KM, RP Bund of
River Jhelum at RD ' 95.580-95.800 KM (Length = 120 Mtrs).
b) Construction of toe wall with stone pitching on LP
Bund of River Jhelum (D/S Hajin Bridge RD 114.330-114.400
KM, Khumina RD 108.740 KM, Baharabad RD 109.400- 109.472 KM,
D/S Hajin Bridge RD 114.265-114.300 KM), RP Bund of River
Jhelum (Checki Chandergeer RD 114.810-114.912 KM, Checki S.K
Bala RD 115.560-115.730), & on Paribal Nallah RD 3.930-4.030
KM. c) Slope Stabilisation by revetment with Geo
Materials on R/S of River Jhelum (Galibal U/S Sadunara RD
116.900-117 .O27 KM, D/S Sadunara RD 117.600-117.725 Kn/I,
Zoonipora Hakabara RD 110.500- llO.72O KM) and L/S of River
Jhelum (Baharabad RD 109.400-110.200 KM, Ladipora RD
119.700-119.820 KM, at Dagta Mohalla RD 95.320-96.380 KM
(tength = 60 Mtrs), at Sumbal Market RD 103.250-103.310 KM
(tength = 60 Mtrs| d) Construction of Spurs on t/S of River
Jhelum at RD 108.22 and RD 109.00 KM (under Comprehensive
Protramme of river Jhelum and its tributaries Phase-iI (PART
A)
|
4711-fmp |
02.12.2024 |
223 |
Chief engineer office |
Construction of retaining wall over pile cap on both sides
of river Jhelum RD 159.798 to RD 170.405 under Comprehensive
Flood Management Protramme of River Jhelum and its
tributaries Phase-ii (Part A).
|
4711-fmp |
27.11.2024 |
222 |
Chief engineer office |
Improvements/Upgradation of Lar Irrigation Canal Ganderbal.
|
4701 NABARD (MMI) |
26.11.2024 |
02 |
SE hYD. CIRCLE SRINAGAR |
Allotment no. 02 of 2024-25
- Raising by way of
construction of Parapet wall on left side of River
Jhelum at D/S and U/S Bell Mouth RD 68.00 Km to 68.90 Km
(at Spots).
- Raising by way of construction of RCC Edge wall on
left side embankment of River Jhelum at D/S RD 68.90 Km.
- Raising of embankment on Right Side of River Jhelum
by way of earth filling and construction of Edge Wall at
Pandrethan U/S Dagger Huts at spots at RD 63.70 Kms.
|
4711-FMPBAP |
22.11.2024 |
01 |
SE hYD. CIRCLE SRINAGAR |
FLOOD PROTECTION WORKS OF SINDH NALLAH AND ITS TRIBUTARIES
UNDER FMBAP PHASE-II PART-A READ WITH
CORRIGENDUM
CORRIGENDUM NO. 01 DATED 27.11.2024
|
4711-FMPBAP |
14.11.2024 |
15 |
ifcd handwara |
construction of lining wall on both sides of unsoo ujroo
khul at Khari khrit (fresh) |
district capex |
14.11.2024 |
14 |
ifcd handwara |
Providing and installing of winch machines for gates of lal
kul. |
district capex |
14.11.2024 |
13 |
ifcd handwara |
Providing and installing of sluice valves for storage tanks
in upper Rajwar Area and Lower Rajwar Area. |
district capex |
12.11.2024 |
221 |
CHIEF ENGINEER OFFICE |
fIXATION OF CONTRACT FOR: AUCTION OF SACKED/UNSERVICEABLE
MATERIAL AT DIVISIONAL STORE OF I&FC DIVISION SRINAGAR
|
NA |
31.10.2024 |
09 |
ifcd handwara |
construction of lining wall/deepaning & widening of
chountipora khul from RD 0-500 mtrs minors of dehgam khul. |
4711-ut capex |
18.10.2024 |
36 |
id ompura |
DEVELOPMENT OF IRRIGATION CANAL NEAR THE HOUSE OF MOHD
JAFFAR BHAT, ALI MOHD BHAT & OTHERS AT KARIPORA BUDGAM.
|
4702-DISTRICT CAPEX |
18.10.2024 |
35 |
id ompura |
bed treatment and jacketing to existing syed ali alai canal
in village pakherpora d/s rd 500m at spots.
|
4702-DISTRICT CAPEX |
18.10.2024 |
34 |
id ompura |
construction of cement concrete lined channel to chuntkuji
dara m/o zani canal at jawalapora.
|
4702-DISTRICT CAPEX |
17.10.2024 |
1766-71 |
MICD SRINAGAR |
FACILITATION OF DRINKING/PORTABLE WATER FACILITY TO
DIVISIONAL AND SUBORDINATE OFFICES OF MICD SRINAGAR
|
NA |
17.10.2024 |
1760-61 |
MICD SRINAGAR |
FABRICATION AND FITTING OF MS PIPE SEGMENT ....
|
NA |
17.10.2024 |
1754-59 |
MICD SRINAGAR |
REPAIRS OF LRS NO. 4 AND NO. 7 AND REPLACEMENT OF CABLE
TERMINATION KIT ....
|
NA |
14.10.2024 |
1719-24 |
MICD SRINAGAR |
ELECTRICAL/MECHANICAL TO BE CARRIED OUT VARIOUS TUBEWELL
IRRIGATION STATIONS OF MECHANICAL IRRIGATION TUBEWELL SUB
DIVISION OF MICD SRINAGAR
|
NA |
11.10.2024 |
25 |
id ompura |
restoration of patwav khul offtake point rd-0 .....
|
4702-DISTRICT CAPEX |
11.10.2024 |
24 |
id ompura |
construction of 03 no. culverts near markazi jamia
masjid.......
|
PRI GRANTS |
11.10.2024 |
23 |
id ompura |
rooftop rainwater harvesting structure for dc office complex
budgam.
|
4702-DISTRICT CAPEX |
11.10.2024 |
13 |
id ompura |
improvement of saida khul by way of construction of
lining wall/retaining wall & bed treatment.
|
4702-UT CAPEX |
09.10.2024 |
2357-61 |
MID SRINAGAR |
REPLACEMENT OF DAMAGED PARTS AND REPAIRS OF THE 15 CUSEC 02
STAGE VT PUMPING UNIT NO. 03 AT LIS LETHPORA STAGE 1ST.
|
NA |
09.10.2024 |
2352-56 |
MID SRINAGAR |
REPLACEMENT OF DAMAGED PARTS AND REPAIRS OF THE 15 CUSEC 02
STAGE VT PUMPING UNIT NO. 04 AT LIS LETHPORA STAGE 1ST.
|
NA |
16.08.2024 |
18 |
ICD PAMPORE |
HIRING OF VEHICLE
|
NA |
16.08.2024 |
17 |
ICD PAMPORE |
CONSTRCUTION OF CEMENT CONCRETE LINING OF BARSOO MINOR FROM
RD 1930 TO 2260 FT OF LETHPORA LIS
|
2702-M&R |
16.08.2024 |
16 |
ICD PAMPORE |
CONSTRUCTION OF CEMENT CONCRETE LINING OF MAIN CANAL FROM RD
12600 TO 2810 FT OF LETHPORA LIS
|
2702-M&R |
16.08.2024 |
15 |
ICD PAMPORE |
CLEARANCE OF SILT FROM INTAKE/SUMP AT STAGE 1ST, STAGE 2ND,
STAGE 3RD PUMP HOUSE OF LETHPORA LIS
|
2702-M&R |
16.08.2024 |
1851-55 |
MID SRINAGAR |
UPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 2.8 KVA
PORTABLE GENERATOR
|
NA |
16.08.2024 |
1827-31 |
MID SRINAGAR |
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF
CONFERENCE & PUBLIC ADDRESS SYSTEM IN THE CONFERENCE/MEETING
HALL OF MECHANICAL CIRCLE SRINAGAR
|
NA |
14.08.2024 |
220 |
chief engineer office |
supply of empty cement bags for stores of micd srinagar
required by the territorial division during floods
|
2711-m&r |
12.08.2024 |
1755-60 |
MID SRINAGAR |
LIS USMAN MOHALLA GUTLIBAGH- UNDER CAPEX BUDGET 2023-24
|
NA |
23.07.2024 |
35 |
MID SHADIPORA |
REPLACEMENT OF DAMAGED BEARINGS OF 50 HP MOTOR OF VT PUMPING
UNIT NO. 2 AT KARTARGUND MAIN LIS OF MISD SUMBAL
|
NA |
23.07.2024 |
34 |
MID SHADIPORA |
REWINDING/REPAIRS OF 5 HP HORIZONTAL CU. WOUND OF PRIMING
MOTORS AND OVERHAULING OF 100 HP OISD STARTER OF LIS
SONMERTENG.
|
NA |
22.07.2024 |
33 |
MID SHADIPORA |
ELECTRICAL REPAIRS TO PANEL BOARD AT LIS PAHALYARI OF MISD
HAJIN
|
NA |
22.07.2024 |
32 |
MID SHADIPORA |
ELECTRICAL REPAIRS TO PANEL BOARD AT LIS BANDIPORA YARI OF
MISD HAJIN
|
NA |
20.07.2024 |
31 |
MID SHADIPORA |
REPAIRS OF 300 DIA MS FOOT VALVE AT LIS BUTADUB OF MISD
HAJIN
|
NA |
19.07.2024 |
30 |
MID SHADIPORA |
REPAIRS TO 300 MM DIA MS FOOT VALVE STRENGTHENING OF BASE
FRAME AT LIS YALGEERI.
|
NA |
21.06.2024 |
901-05 |
MID SRINAGAR |
ELECTRICAL REPAIRS/REWINDING OF 1.6 MVA TRANSFORMER OF LIS
MARVEL STAGE 3RD
|
NA |
08.06.2024 |
08 |
IFCD HANDWARA |
STAGE CONTRACT: ANNUAL MAINTENANCE ....
|
2702-m&r |
08.06.2024 |
07 |
IFCD HANDWARA |
ENGAGEMENT/HIRING OF COMMERCIAL VEHICLE...
|
2702-m&r |
03.06.2024 |
06 |
IFCD HANDWARA |
STAGE CONTRACT: ANNUAL MAINTENANCE ....
|
2702-m&r |
03.06.2024 |
05 |
IFCD HANDWARA |
ANNUAL MAINTENANCE REPAIR RESTORATION OF DAMAGED
EMBANKMENTS....
|
2711-m&r |
03.06.2024 |
04 |
IFCD HANDWARA |
STAGE CONTRACT: ANNUAL MAINTENANCE ....
|
2702-m&r |
01.06.2024 |
03 |
IFCD HANDWARA |
ANNUAL MAINTENANCE REPAIR RESTORATION OF DAMAGED
EMBANKMENTS....
|
2711-m&r |
01.06.2024 |
02 |
IFCD HANDWARA |
ANNUAL MAINTENANCE REPAIR RESTORATION OF DAMAGED
EMBANKMENTS....
|
2711-m&r |
30.05.2024 |
01 |
IFCD HANDWARA |
STAGE CONTRACT: ANNUAL MAINTENANCE
|
2702-m&r |
29.05.2024 |
219 |
Chief engineer office |
fixation of contract for supply of empty cement bags
|
2711-m&r |